Grundartangi alloy factory
Construction and installation of new smoke hoods for plant furnaces #1 and #2 together with the cooling systems connected to them. A new packing line for loose material in containers was designed and hooked up to the existing system, with improvements to various processing systems and equipment for Elkem.
Role
- EPCM
- Engineering
- Procurement
- Construction Management
- Health & safety
- Project Management
- Project Control
120.000 tons
Production capacity3
Furnaces1979
Start-up“Elkem has strict requirements for minimising environmental impact and ensuring high levels of operational and staff safety. These requirements tie in nicely with our constant prioritisation of safety and quality assurance.”
Project Manager