Hydro Project - Sigalda
Sigalda Hydroelectric Power PlantConstruction of the Sigalda Hydroelectric Power Station began in 1973, and the station’s three 50-MW turbines went online in 1977-78. The Sigalda Station is linked into the national grid with 220 kV transmission lines to the Sultartangi, Hrauneyjafoss and Vatnsfell Stations, as well as a 132-kV line to southeast Iceland.

Technical data:
Client: The National Power Company – Landsvirkjun
Installed capacity: 150 MW
Turbines: 3 Francis units, vertical axis.
Gross head: 74 m
Harnessed discharge: 230 m3/s
Annual energy production: 650 GWh
Sigalda Dam: Length: 925 m; crest 42 m
Water reservoir: Krokslon Reservoir; 498 m.a.s.l.; storage capacity of 140 million m3.
Pressure shafts: 3 sloped pressure shafts; ø4.3 m; length 216 m
Headrace canal: 1000 m
Tailrace canal: 550 m

Mannvit services:
Feasibility studies, site investigation, civil works design, structural and mechanical design including preliminary design and final design. The company also handled cost estimates, tender documents, contract documents, bid evaluation, project planning and assessment of harnessing choices.

 
 
Hydro Project - Sigalda
(Printable version)

Additional information:


 

Ómar Ö. Ingólfsson

Section Manager of Hydropower and Power Transmission & Distribution

       
Send email


 

Gunnar Herbertsson

Section Manager of Hydropower & Mechanical


       
Send email